16 September 2024

GN63 Installation of Low Resistance (LR) Underlay Considerations

This guidance has been formulated to clarify the requirements in the British standards and BBA Bulletin No2 when leaving roofing underlays exposed for a period of time prior to the final roof covering being installed.