HSGS42 Considerations for Method Statements when Loading out Portal-Framed Structures
This guidance is not a method statement but highlights important items that the method statement for Safe System of Work (SSOW) should cover for loading out portal frame structures in preparation for installing roof sheets and panels.
This guidance is not a method statement but highlights important items that the method statement for Safe System of Work (SSOW) should cover for loading out portal frame structures in preparation for installing roof sheets and panels.