This document has been developed to set out the minimum requirements required by NFRC members when working on pitched roofs.
This document has been developed to set out the minimum requirements required by NFRC members when working on pitched roofs. However, the same requirements will apply to most roofs and should not be disregarded, as all involved have legal obligations to ensure the health and safety of all workers.
NFRC have collaborated with The Bat Conservation Trust (BCT) to produce this guidance for bat and roof risk management and considerations during roofing works.
Remediation continues to be a major focus for the Building Safety Regulator (BSR), with the latest Gateway Two data highlighting the increasing pressure on approval times for existing building safety works.